Cutty Sark rises from the ashes (Jim Solomon, Buro Happold)
发布日期

N / A.

价钱

标准:£9 +增值税
会员/订阅者:免费

立即购买
Back to Previous

Cutty Sark rises from the ashes (Jim Solomon, Buro Happold)

结构工程师
发布日期

N / A.

价钱

标准:£9 +增值税
会员/订阅者:免费

立即购买

附加信息

Format:
PDF
出版商:
万博体育手机客户端登录

标签

问题11.

相关资源和活动

结构工程师
<H4>约克郡分公司庆祝百年教堂</ h4>
结构工程师
<H4> Web开口产生差异</ h4>

Web开放有所作为

价钱 -£9
结构工程师
<h4>Refurbishment of St Pancras: justification of cast iron columns</h4>

Refurbishment of St Pancras: justification of cast iron columns

介绍了一个广泛的公共关系的结果ogramme of material and full-scale laboratory tests undertaken on existing cast iron columns from St Pancras Railway Station in London. The original station, which was constructed during the 1860s, has been upgraded to form the international terminus for the Channel Tunnel Rail Link. The existing station is Grade I listed, and is incorporated into the new station scheme. The current use will impose greater vertical loads and horizontal displacements on the cast iron columns than they previously experienced. A preliminary assessment suggested that it would be prudent to undertake a programme of tests to determine the material properties and understand the structural behaviour under load with more confidence. A total of five columns were made available for full-scale testing to destruction; these were made redundant by the introduction of escalator slots and light wells. In addition, coupons were obtained from columns for material tests. The coupon tests provided sufficient information to determine a reliable materials model suitable for a non-linear finite element analysis of the columns. The full-scale tests confirmed that the presence of cast-in features affects the overall structural behaviour of the column. In addition, it confirmed that the 1860s practice of standing columns on padstones with a layer of felt between is an unsatisfactory detail, and can initiate premature failure of the column base. The results from the material and full-scale tests have been compared. It is concluded that there is consistency between the material and fullscale tests. Back analysis of the full-scale tests using the material model developed from the material tests confirmed that the model is reliable for analysis in the permissible stress domain and gives reasonable assessments of the failure mode and load when lack-of-fit conditions can be properly assessed. Ian Brooks, BSc(Eng), MSc DIC, CEng, MIStructE, MICE Associate, Ove Arup & Partners Ltd Alan Browne, BSc(Eng), CEng, FICE Associate Director, Ove Arup & Partners Ltd David Alan Gration, BEng CEng MIMechE Associate Director, Ove Arup & Partners Ltd Andrew McNulty, MA, MSc, DIC, CEng, MICE Associate Director, Ove Arup & Partners Ltd The authors were seconded to Rail Link Engineering for the work described in this paper.

作者 -布鲁克斯,伊恩;布朗,艾伦; Gration,David Alan; McNulty,Andrew
价钱 -£9
Baidu